Friday, 8 July 2011
Poole Twin Sails bridge
Brian Bing attended a Chartered Institution of Highways and Transportation technical visit to the new iconic Poole Twin Sails bridge site on 7th July. This unique lifting bridge will be assembled in situ over the next two weeks and the new bridge is planned to be opened to traffic by New Year. The bridge design and implementation is superb and a credit to the team responsible.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment